Cross border electricity trade cooperation has become an increasingly prevalent phenomenon in the ASEAN region, particularly following the COVID-19 pandemic, which altered the dynamics of electricity demand in several countries. This study aims to examine the process of cooperation in ASEAN electricity trade from 2020 to 2025 within the LTMS-PIP framework. Using a qualitative descriptive research design that explains the phenomenon of the cooperation process directly established among four countries through corporations, this study utilizes secondary sources, namely official reports, to answer the research questions. The analysis in this paper is conducted through three stages within the “Three Stages of Cooperation” conceptual framework, which includes bargaining, agreement, and enforcement. The author found that this initiated cooperation began with a series of negotiation agendas that formulated points to be agreed upon ranging from technical to commercial matters that form the basis of the cooperation, followed by the signing of an agreement as a legally binding framework reflecting the negotiation results of both parties, and the implementation of the project, which will take place over the next two years. In these findings, the researcher also highlights several compliance processes that have been established in accordance with the joint agreement signed through the MOU. This study is expected to provide new insights into the dynamics of multilateral cooperation and the mechanisms that support regional interconnectivity.

References

Bella Rachmanailla, A. A. (2020). Kerja Sama Perdagangan Pelumas Otomotif PT Pertamina Lubricants Dengan Indonaldini Group Swiss . Padjadjaran Journal of International Relations, 133-146.

berhad, T. N. (2021). Energy reserves for reliable power supply. tnb.com.

Berhad, T. N. (2025). Tenaga Nasional Berhad Company Profile. craft.co.

EDB, S. E. (2024). Singapore’s demand for clean imported energy helps usher in a regional power grid: EMA chief. Singapore Economic Development Board EDB.

Huda, M. S. (n.d.). Accelerating progress on the ASEAN Power Grid 2.0: Lessons from the Laos-Thailand-Malaysia-Singapore Power Integration Project (LTMS-PIP). gratermekong.orng.

Ifyyin. (2022). Singapore commences first renewable electricity import from Lao PDR. spglobal.com.

Jayanandan, S. (2024). Perjanjian TNB–Keppel Electric dan TNB–SP PowerAssets. Kuala Lumpur: The Edge Malaysia.

Keppel, I. (2022b). Siaran pers dimulainya perdagangan listrik Laos–Singapura,. Keppel.com.

Kepple, I. (2022a). Siaran pers lisensi importir listrik EMA untuk Keppel Electric. Kepple.com.

Lee, H. (2024, Juni 6). Unlocking the ASEAN Power Grid (APG) Potential. Retrieved from Asia Clean Energy Forum.

Mail, M. (2025). DPM Fadillah calls for Asean member states to strengthen energy cooperation. Malaymail.

Ministry of Energy, T. a. (2023). 41ST ASEAN MINISTERS ON ENERGY MEETING REAFFIRMS COMMITMENT TOWARDS REGIONAL ENERGY INTERCONNECTIVITY AND ENERGY SECURITY. Ministry of Energy, Trade and Industry.

Ministry of Trade and Industry Singapore. (2025). Sixth Joint Statement of Lao PDR-Thailand-Malaysia-Singapore Power Integration Project. Ministry of Trade and Industry Singapore.

Partners, T. &. (2024, Juni). Malaysia to Singapore Electricity Imports. Retrieved from Bird & bird: https://www.twobirds.com/-/media/new-website-content/insights/pdfs/power-import-from-malaysia-to-singapore.pdf

PDR, L. (2024). Fifth joint statement of the Lao PDR-Thailand-Malaysia-Singapore Power Integration Project. mti.gov.sg.

Power, L. C. (2026, May 31). Low Carbon Power. Retrieved from lowcarbonpwer.org: https://lowcarbonpower.org/region/Malaysia

Sabina Putri Aulia, S. G. (2025). LTMS-PIP for ASEAN Energy Integration: How the Members’ National Interests Drive the Cooperation. Journal of International Studies on Energy Affairs, 144-172.

Singapore, M. o. (2026). Low-Carbon Electricity Import. Ministry of Trade and Industry Singapore.

Sudarshan Varadhan, P. W.-u. (2024). Singapore-Laos clean power deal stuck over transmission, sources say. Singapore and Bangkok: Reuters.

Sugiyono. (2013). Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Alfabeta.

Tenaga Nasional Berhad. (2026). Signing of Energy Wheeling Agreement Phase 2 between TNB, EDL and EGAT. klsescreener.com.

Tenaga Nasional Berhad. (2026). TNB EDL AND EGAT ADVANCE ASEAN POWER GRID THROUGH ENERGY WHEELING AGREEMENT PHASE 2 UNDER LTMS-PIP 2.0. tnb.com.

Thomas Rixen, I. R. (2005). taxation, The political economy of bilateralism and multilateralism: Institutional choice in international trade and. SSRN, 28.

TNB. (2026). TNB EDL AND EGAT ADVANCE ASEAN POWER GRID THROUGH ENERGU WHEELING AGREEMENT PHASE 2 UNDER LTMS-PIP 2.0. Kuala Lumpur: tnb.com.

TNGlobal. (2024). COMMITMENT TOWARDS REGIONAL ENERGY INTERCONNECTIVITY. TNglobal.

UNESCAP. (2023, oktober). Laos-Thailand-Malaysia-Singapore Power Integration Project (LTMS PIP). Retrieved from unescap.orng: https://www.unescap.org/sites/default/d8files/event-documents/Laos-Thailand-Malaysia-Singapore%20Power%20Integration%20Project_Malaysia.pdf

Xunpeng Shi, L. Y. (2020). Economic Integration in Southeast Asia: The Case of the ASEAN Power Grid. The Journal of Economic Integration, 152-171.

Downloads

Published

18-11-2026

Data Availability Statement

The data supporting the findings of this study are available from publicly accessible sources cited in the article.

Issue

Section

Articles

How to Cite

From Bargaining to Enforcement: Cross-Border Electricity Trade in Southeast Asia’s LTMS-PIP 2020–2025. (2026). Global Focus, 6(2), 114-131. https://doi.org/10.21776/ub.jgf.2026.006.02.1